|
RECENT PROJECTS
Lithko Contracting: On the second phase of the Target Distribution in Savannah, Georgia, Cherokee placed over 1.2 square feet of slab on grade concrete along with tilt-up for Lithko. Their project manager was Aaron Curtis.
Potter Concrete: On the Target Distribution Center in Savannah, Georgia, Cherokee pumped over 1.5 million square feet of slab along with tilt-up concrete. Several of the pours used multiple machines pumping over a 1,000 yards per pour. The Potter superintendent was Rene Monjaraz and their project manager was Brent Cox.
Carter Concrete: The IDI project near Atlanta was a large computer facility in which Cherokee used multiple boom trucks to pump over one mile vertical walls and slabs for Carter. Carter Concrete’s superintendent was Gary Parker, and the project manager was Kirby Yoder.
Formworks: On the Miami Dolphin stadium addition, Cherokee used multiple boom trucks to place concrete around the perimeter of the structure. Formworks superintendent was Jerry Brown
Facchina-McGaughan/Baker Concrete: 500 Brickell was two 44 story towers connected by an 11 story parking deck in downtown Miami. Cherokee placed one 32 meter placing boom on each tower which was serviced by one large, Schwing 8800, trailer pump. The Baker superintendent was Keith Bisson and the project manager was Ray Pisaneschi.
Suffolk Construction/Baker Concrete: The Oceans Edge project in West Palm Beach was one 22 story tower. Cherokee used a 28 meter detach placing boom. The Baker Concrete-the Baker superintendent was Clay Hamby.
KM Plaza/Baker Concrete: The Carrilion project on south beach in Miami had two towers, a 31 and 37 story along with an 8 story parking deck. Cherokee utilized a 32 meter detach placing boom to pump the towers. The Baker superintendent was Kevin Churchman and the project manager was Hans Rowland.
Hunt Construction/Baker Concrete: The project was two 28 story towers on A1A in Fort Lauderdale; Cherokee placed to vertical lines to service one 39 meter placing boom on each tower. The Baker superintendent was John Schroeder and the project manager was Burt Reedy.
Hardin Construction: On 3344 Peachtree in the Buckhead area of Atlanta, Cherokee pumped a 52 story tower along with an 11 story parking deck utilizing a 39 meter placing boom on the tower and a 32 meter placing boom on the parking. Both placing booms were fed by one large trailer pump, a Schwing 8800. Hardin Construction superintendent was Billy McElroy and the project manager was Skip Loman.
Baker Concrete/Brice Building: Honda
A2 Automotive plant in Lincoln, Alabama.
Cherokee pumped 45,000 cubic yards in 3
months with no break downs. Project manger
for Baker was Randy Nehlan and project
superintendent for Baker Concrete was Joe
Botto.
Hensel-Phelps: Atlanta/Hartsfield
airport new air traffic control tower.
Cherokee pumped 2,200 matt foundation along
with 3,000 additional yards in building
structures and parking deck. Project superintendent
was Lane Griffin.
Hoar Construction: WC
Bradley Building in Columbus, Georgia.
Cherokee pumped 15,000 yards in four story
concrete structure and adjacent parking
deck. The project superintendent was Joe
Freeman and assistant superintendent was
Charlie Ricks.
Batson-Cook: Troup County
Government Center in LaGrange, Georgia.
Cherokee pumped 13,000 yards in five story
concrete structure along with a three story
parking deck. The project manager was Paul
Meadows and the project superintendent
was Ed Ramsur.
VCC: Ikea
Furniture at Atlantic Station in Atlanta,
Georgia. Cherokee pumped 10,000 yards
of concrete on the south’s largest
furniture store along with a parking
deck. The project superintendent was
Rusty Mainer.
Archer-Western: Liberty
Street Parking Deck in downtown Savannah.
Cherokee pumped 5,000 yards. The project
superintendent was David Powers.
RJ Griffin & Company: John
B. Amos Cancer Center in Columbus. Cherokee
pumped 8,000 yards on a new cancer center.
The project superintendent was Glenn Cadle
and the project manager was Stephen Strickland.
TIC: Casey Canel project
through downtown Savannah. Cherokee pumped
over 30,000 yards. The project superintendent
was Chuck Hucks. The project manager was
Charlie George.
RJ Griffin & Company: St.
Josephs/Candler Cancer Center in Savannah,
Georgia. Cherokee pumped 12,000 on a new
cancer center and adjacent parking deck.
The project superintendent was Jim Myer
and project manager was Martin Steineker.
Scott Bridge Company: I-95
expansion in Brunswick, Georgia. Cherokee
pumped over 20,000 yards on thirteen bridges.
The project superintendent was Bill Johnson.
Carter Concrete: Green
and Purple parking decks for Medical Center
of Central Georgia. Cherokee pumped 9,300
yards. The project manager was Eric Ristec
and the project superintendent was Andy
Higgins. |